BUILDING IMPROVEMENTS TIME LINE

The building has been continually upgraded for the past 3 years

2020
  • Common area floor tile replacement
  • Fire alarm replacement
2019
  • Common area lights replaced with energy saving LED
  • Basement parking floors repainting
  • Basement lighting replacement with energy saving LED
2018
  • Storeroom and plant room refreshment
  • Toilet refurbishment
  • Common area repainting
2017
  • Reception complete refurbishement
  • Basement 2 lift lobby refurbishement
  • Air Handling Unit replacement
  • Chilled water riser replacement
aurora tower building