BUILDING IMPROVEMENTS TIME LINE
The building has been continually upgraded for the past 3 years
2020
- Common area floor tile replacement
- Fire alarm replacement
2019
- Common area lights replaced with energy saving LED
- Basement parking floors repainting
- Basement lighting replacement with energy saving LED
2018
- Storeroom and plant room refreshment
- Toilet refurbishment
- Common area repainting
2017
- Reception complete refurbishement
- Basement 2 lift lobby refurbishement
- Air Handling Unit replacement
- Chilled water riser replacement
QUICK LINKS
INFORMATION
SIGN UP TO OUR NEWSLETTER
Take your place at Aurora Tower. Sign up for a digital brochure to find out more.