BUILDING IMPROVEMENTS TIME LINE

The building has been continually upgraded for the past 3 years


2020

  • Common area floor tile replacement
  • Fire alarm replacement

2019

  • Common area lights replaced with energy saving LED
  • Basement parking floors repainting
  • Basement lighting replacement with energy saving LED

2018

  • Storeroom and plant room refreshment
  • Toilet refurbishement
  • Common area repainting

2017

  • Reception complete refurbishement
  • Basement 2 lift lobby refurbishement
  • Air Handling Unit replacement
  • Chilled water riser replacement